en

전기기술 스마트 가이드
Install Now
전기기술 스마트 가이드
전기기술 스마트 가이드

전기기술 스마트 가이드

During construction and supervision of electrical equipment calculation Notes

Developer: B.s.y.
App Size: Varies With Device
Release Date: Aug 18, 2016
Price: Free
1
6 Ratings
Size:
Varies With Device
Download APK
Google Play

Screenshots for App

Mobile
Should be selected Substation Design capacity when entering the primary current, CT, Wave-type, non-current-limiting fuses, MOF specification, ASS settings, transformers, capacitor capacity, secondary current, secondary breaker capacity, the two kinds of ground wire thickness .
Load capacity condenser, asking for the current power factor, input power factor when the target capacitance required, jeolgamyul current, power loss reduction, it is possible to obtain an equivalent dose, single-phase capacitor and three phase capacitor value of the reactive power.
Depending on the construction method allowed when the wire current-wire method selection circuits can be selected wire size in advance. Construction methods note attached.

The tray area can be calculated according to the wire size.
KEPCO know the facility charges (processing, underground, added distance), and it can be seen that the use of pre-construction safety inspection, periodic inspection, electrical safety check amount.
Show More
More Information about: 전기기술 스마트 가이드
Price: Free
Version: 4.5
Size: Varies With Device
Release Date: Aug 18, 2016
Content Rating: Everyone
Developer: B.s.y.
Developer Apps:
Recent Releases

Whatsapp
Vkontakte
Telegram
Reddit
Pinterest
Linkedin
Hide